Sign in

Action detail

Re-sequence Plant Modernization Wave 2

Change Sequencing · Operations

Why this action was created

Organizational signal addressed

Change Capacity at 41 in Operations. Overlapping rollouts are the binding constraint.

Intended organizational outcome

Reduce concurrent rollout load so Operations teams can absorb Wave 2.

What RIDIER observed

  • Adoption Readiness moved from 58 to 55 following the intervention period; a decline was observed — worth continued monitoring.
  • Readiness shifted from a stable to a deteriorating trajectory following the intervention period.
  • Adoption Readiness moved from 58 to 55 following the intervention period; a decline was observed — worth continued monitoring.

Action details

Owner

Marcus Adeyemi

Status

In progress

Planned start

2026-06-22

Actual start

2026-06-23

Target completion

2026-07-17

Actual completion

2026-07-17

PSI™ dimensions

Adoption Readiness

Methodology

psi-intervention-v1

Baseline, follow-up and observed movement

Isolated interventionStableDeteriorating

Baseline

58

Adoption Readiness · auto period

Follow-up

55

Adoption Readiness · auto period

Observed movement

-3

Following the intervention period

Adoption outcome

No outcome measured yet

Adoption Readiness

Baseline 58 → follow-up 55 · -3

Limitations and attribution

  • RIDIER records what was done and what was observed afterwards. Observed movement is associated with the period, not attributed to this action. Seasonality, external events and measurement variation can all contribute.
Intervention method
psi-intervention-v1
Baseline PSI™ method
northwind-demo-v0
Follow-up PSI™ method
northwind-demo-v0
Readiness method
psi-readiness-v1
Trajectory method
psi-trajectory-v1
Comparison generated
2026-09-13