Re-sequence Plant Modernization Wave 2
Change Sequencing · Operations
Why this action was created
Organizational signal addressed
Change Capacity at 41 in Operations. Overlapping rollouts are the binding constraint.
Intended organizational outcome
Reduce concurrent rollout load so Operations teams can absorb Wave 2.
What RIDIER observed
- Adoption Readiness moved from 58 to 55 following the intervention period; a decline was observed — worth continued monitoring.
- Readiness shifted from a stable to a deteriorating trajectory following the intervention period.
- Adoption Readiness moved from 58 to 55 following the intervention period; a decline was observed — worth continued monitoring.
Action details
Owner
Marcus Adeyemi
Status
In progress
Planned start
2026-06-22
Actual start
2026-06-23
Target completion
2026-07-17
Actual completion
2026-07-17
PSI™ dimensions
Adoption Readiness
Methodology
psi-intervention-v1
Baseline, follow-up and observed movement
Isolated interventionStable → Deteriorating
Baseline
58
Adoption Readiness · auto period
Follow-up
55
Adoption Readiness · auto period
Observed movement
-3
Following the intervention period
Adoption outcome
—
No outcome measured yet
Adoption Readiness
Baseline 58 → follow-up 55 · -3
Limitations and attribution
- RIDIER records what was done and what was observed afterwards. Observed movement is associated with the period, not attributed to this action. Seasonality, external events and measurement variation can all contribute.
- Intervention method
- psi-intervention-v1
- Baseline PSI™ method
- northwind-demo-v0
- Follow-up PSI™ method
- northwind-demo-v0
- Readiness method
- psi-readiness-v1
- Trajectory method
- psi-trajectory-v1
- Comparison generated
- 2026-09-13