Run listening session with Supply Chain shift leads
Manager Listening · Supply Chain
Why this action was created
Organizational signal addressed
Comment volume down 38% alongside falling Psychological Safety.
Intended organizational outcome
Create a direct channel for shift leads to raise concerns.
What RIDIER observed
- Adoption Readiness moved from 60 to 59 following the intervention period; a decline was observed — worth continued monitoring.
- Readiness remained on a stable trajectory across the intervention period.
- Not enough conversations to evaluate movement.
Action details
Owner
Priya Raghunathan
Status
Not started
Planned start
2026-07-06
Actual start
2026-07-07
Target completion
2026-07-31
Actual completion
2026-07-30
PSI™ dimensions
Psychological Safety
Methodology
psi-intervention-v1
Baseline, follow-up and observed movement
Overlapping intervention periodStable → Stable
Baseline
60
Adoption Readiness · auto period
Follow-up
59
Adoption Readiness · auto period
Observed movement
-1
Following the intervention period
Adoption outcome
—
No outcome measured yet
Limitations and attribution
- Multiple organizational actions occurred during this period. The observed movement cannot be attributed to a single intervention.
- RIDIER records what was done and what was observed afterwards. Observed movement is associated with the period, not attributed to this action. Seasonality, external events and measurement variation can all contribute.
- Intervention method
- psi-intervention-v1
- Baseline PSI™ method
- northwind-demo-v0
- Follow-up PSI™ method
- northwind-demo-v0
- Readiness method
- psi-readiness-v1
- Trajectory method
- psi-trajectory-v1
- Comparison generated
- 2026-09-13